The municipality provides public sewer connection on private property. If your home or business is not connected to the sewer system, you will request a connection from the municipality.

  • The municipality will provide the connection to the boundary of your property.
  • On your own property, you must provide your own sewerage.

Request

Sewer connection request

General conditions

When constructing sewers, you must adhere to the General Conditions and Rules of Operation ( pdf).

Cost

Cost of standard sewer connections

Equipped with a diameter of 12.5cm and a length of up to 9m¹.

During construction residential preparation (per connection):

DescriptionCost
House connection (VW)€ 596,00
House connection (SW)€ 596,00
Drain connection€ 1.041,00
Keet/temporary connection€ 1.041,00

In existing pavement (per connection):

DescriptionCost
House connection (VW)€ 968,00
House connection (SW)€ 968,00
Drain connection€ 1.041,00
Keet/temporary connection€ 1.041,00

Price changes and typographical errors reserved.

Cost of other home connections

The cost of making connections with different dimensions or materials will be determined and charged on an after-the-fact basis.

How long will it take?

Upon receipt of your application, you will receive a letter with more information about the processing time.