Schedule for the final phase of dredging work on the Broekwegwetering

An additional section of the Broekwegwetering is being dredged. As a result, the work will take slightly longer than planned. We expect to complete all work before the summer vacation, in July 2026.

Accessibility for boats

We try to keep as much space as possible open for boats that want to sail out onto the lake.

Planning

The map below shows where Gebr. van der Poel b.v. is currently working. Work is being carried out using a dredger in the purple areas, and using a crane on a floating platform in the orange areas.